The Ones
Who Shape Tomorrow

BUILDING A FUTURE FOR

For 50 years, God has used Traders Point Christian Schools to shape students who love Him, serve others, and lead with courage.

Now it is our turn to shape what comes next.

The Ones Who Shape Tomorrow is the fundraising initiative connected to our Year of Jubilee. It is rooted in a simple truth: the future of our school will be built by the faithfulness of those who invest in it today.

This campaign is not about buildings alone. It is about access. It is about excellence. It is about preparing students to step confidently into the calling God has placed on their lives.

As we celebrate where we have been, we are also stepping forward in faith to strengthen our foundation for the next generation of Knights.

The Foundation We’re Building

Middle School Classroom Buildout and Building Upgrades

To better support our growing enrollment at the Upper School, we need to build two additional classrooms in our Middle School space to give our students the best learning environment possible.

  • Addition of at least two classrooms on the upper level of the Middle School building

  • Removal of the carpet and refinishing of the concrete floor in the cafeteria space

  • Filling in and leveling the fire pit area in Town Square to create more seating in the cafeteria space

  • Replacement of the current security system to create a unified system across both Lower School and Upper School buildings

Projected Cost: $300,000

Lower School Classroom Buildout and Building Upgrades

As enrollment continues to increase at our Lower School, and to help us increase our class sizes that transition into the Upper School, new classroom space is required at the Lower School. We are looking at adding four additional classrooms to support our growth.

  • Addition of four new classrooms off north wing, where the modular classrooms previously sat

  • Renovation of current 4th grade classrooms to give classroom space back to co-curricular programs and storage to our staff

  • Addition of a private teacher restroom to the north wing, near the new classrooms

  • Removal of the carpet and refinishing of the concrete floor in the cafeteria space

  • Replacement of the current security system to create a unified system across both Lower School and Upper School buildings

Projected Cost: $2,000,000

Early Childhood Co-Curricular Buildout

To ensure every child has the support they need to thrive, we are developing a robust co-curricular program and expanding early intervention services directly within our Early Childhood building. We are also implementing the Hall Pass visitor management system, aligning the EC entrance process with the rest of our campus. These enhancements strengthen both the student experience and the safe, secure environment our families trust.

Projected Cost: $50,000

To help us build the most stable future possible, we’re putting 10% of our fundraising goal toward debt reduction.

The Goal: $2.6 Million

This investment will allow us to move forward with key projects, strengthen operational stability, and position Traders Point Christian Schools for sustainable growth in the decades ahead.

Every gift matters. Every family plays a role. Every act of generosity shapes tomorrow.

The future of TPCS will not be built passively. It will be built by prayerful, courageous generosity.

We invite you to consider how God may be leading your family to invest in this moment. Whether through a one-time gift or a multi-year commitment, your generosity directly impacts students today and generations to come.

Together, we can shape what the next 50 years will look like.

For the Lord has done great things for us, and we are filled with joy.

Psalm 126:3